
- Date
- 15th October 2026
- Categories
- eCooking, Scaling eCooking
By Lawrence Lin, Gianluca Tonolo, Sarah Wykes.
Since 2018, MECS has been demonstrating that the transition to modern electric cooking is realistic, cost-effective and ready for implementation. There is an opportunity to accelerate the transition through new electrification initiatives, including the World Bank and African Development Bank’s Mission 300 programme. Mission 300 aims to halve electricity poverty in Sub-Saharan Africa by 2030, creating a major opportunity to scale up eCooking by integrating cooking loads into national electrification planning.
New research by MECS, in collaboration with Haki Energy, explores how subnational planning can play a critical role in accelerating eCooking transitions by aligning national ambitions and programmes with local priorities and realities.
Drawing on an extensive literature review and six country studies — Kenya, Uganda, Ghana, Ethiopia, Malawi and Nepal — the research examines how subnational energy planning can unlock progress towards eCooking and identifies key barriers, enabling conditions, actors and critical data needed. Building on this evidence base, it develops a practical tool to support decision-making by governments and other stakeholders on priority intervention areas and pathways to detailed planning and implementation.
Why is subnational planning of eCooking transitions important?
Subnational planning plays a critical role in enabling the transition to eCooking by ensuring that eCooking strategies align with local realities, opportunities, and challenges. While central governments set overall policies and targets, effective implementation depends on translating policy into actions suited to local conditions and priorities. National approaches often rely on averages that conceal deep regional and local inequalities in infrastructure, income and service quality. Subnational planning helps bridge this gap by linking national ambition with local priorities, capacities and implementation realities.
While several countries have embedded eCooking within national energy, electrification and clean cooking strategies, there is still a lack of understanding on how to implement eCooking planning at the sub-national level.
Critical barriers and enablers for subnational eCooking transitions
The research identified six areas of enabling factors or constraints for eCooking planning and implementation. Their importance varies significantly between countries and between different locations within the same country.
- Governance and institutional frameworks: Clear mandates, coordination, data access and local capacity are essential. In Kenya, County Energy Plans (CEPs) provide a formal channel for local priorities to feed into national energy planning. In Malawi, the introduction of an Energy Officer in one district led to 55 new energy-related projects in the District Development Plan, illustrating the value of dedicated local technical capacity.
- Financial and fiscal enablers: Local eCooking priorities need to connect to public budgets and finance. In the Malawi example, there is no evidence that the 55 energy projects were implemented. Stronger local planning capacity must be aligned with budgetary cycles, finance and other enabling conditions. In Kenya, CEPs can provide technical evidence and assessments of local demand for eCooking, feeding local priorities into national planning. But this alone does not result in delivery. Concrete CEP interventions must be translated into County Integrated Development Plans and Annual Development Plans, which ultimately decide annual investments, costs and budget allocations.
Integrating eCooking demand into electrification plans can help leverage wider programme investments. Household affordability – a binding constraint according to the latest SDG 7 Tracker Report (2026) – can be addressed through mechanisms such as on-bill financing. Côte d’Ivoire’s Electricity for All Programme (PEPT) used this approach to make electricity connection and metering costs affordable. Uganda’s eCooking strategy includes targeted eCooking tariffs, carbon finance and other support. Whilst MECS support for OBF piloting in Tanzania has been taken up as a national programme by TANESCO. - Technical and system readiness: The local network reliability and capacity and the household electrical infrastructure determine whether eCooking is technically viable. For example, Nepal has near-universal electricity access but many households use low-amperage meters and limited household wiring, constraining the use of higher-power cooking appliances. Understanding readiness at the local level allows the technical changes needed for eCooking adoption, such as appropriate household meters or supply upgrades, to be planned in from the start.
- Social, cultural factors, gender equality, disability and social inclusion (GEDSI) and end user needs: Cooking is a socio-technical practice and subnational (and national) planning needs to reflect the reality of how people cook. The needs of different end users are determined by their local contexts, cultural practices, and social relationships. Technologies need to be carefully aligned with local cooking practices and food preferences. In Ethiopia, some modern alternatives to traditional clay mitads struggle to reproduce the heat characteristics and texture expected when preparing the staple national dish injera.
- Market, supply chain and service delivery: Appliances, distribution, quality assurance, maintenance and repair services all influence uptake and sustained use. In Kenya, Kenya Power and Lighting Company (KPLC)’s Pika Na Power Academy has established regional hubs that combine awareness-raising with repair and maintenance training, strengthening local service capacity. Uganda’s Clean Cooking and eCooking Strategies propose regional distribution hubs linked to local retail networks, with warranties, spare parts and repair services built into the delivery model — highlighting the importance of planning after-sales support from the outset.
- Political economy: Political priorities and incumbent fuel interests can shape and hinder transition pathways. In Kenya, changes in county leadership following five-year election cycles and supplementary budgeting as priorities change can disrupt continuity and implementation of ten-year CEPs. In Ghana, historically strong policy support for LPG is a major barrier to eCooking uptake despite high levels of electricity access.
These enabling factors or constraints rarely operate in isolation. Reliable electricity may create an opportunity for eCooking, for example, but uptake can still be constrained by several or all of these issues, which are explored in greater depth in the Scoping Report.
A decision-support framework for sub-national eCooking planning
From the analysis of enabling factors and barriers to eCooking, a high-level decision-support framework has been developed to help local planners identify significant design issues for consideration when developing subnational eCooking planning and implementation in different contexts (see below).
As local conditions vary substantially, the framework does not prescribe a single model or pathway but focuses on the conditions, entry points, and sequencing that determine whether subnational plans are likely to result in effective planning and delivery of eCooking transitions.
The framework begins with the national policy and enabling environment and then considers two fundamental preconditions: the strength of subnational governance and planning systems, and the readiness of electricity infrastructure to support eCooking. From there, it highlights other factors for consideration — including finance, affordability, local socio-cultural issues and cooking practices, markets and political economy.

From eCooking planning to implementation: critical factors
Effective subnational eCooking transitions require planning that is evidence-based, grounded in local realities and priorities, institutionally anchored, connected to national and utility planning, and ultimately integrated into budgets, with financing and implementation pipelines. Key inputs include granular local data, inclusive stakeholder engagement and context-specific analysis.
The research highlights eight areas that must be considered holistically for effective planning (see graphic featured, top). These are not sequential but iterative steps: they can be considered together and revisited as local conditions, capacities and priorities evolve.
………………………………………………………………………..
Featured image, top: High-level (or Key) considerations for subnational e-cooking planning. (Generated by the authors with support from AI).
AI disclaimer: AI was used to assist with the identification of relevant sources, report structure and proofreading.